P-125联合储备中心

得梅因,爱荷华州

海军和海军陆战队共用这个最先进的训练设施.

46个,199-square-foot Reserve Training Center adjacent to Camp Dodge in Iowa was designed for use by Marine Corps and Navy reservists to increase unit readiness in preparation for combat. 该设施包括可重新配置的管理区域, flexible multi-purpose classrooms and a drill hall large enough for training and ceremonies. 配置, 配色方案, finishes and acoustics played major roles in designing the new facility to meet the users’ individual needs while also providing a cohesive design for all to enjoy upon visiting. The project also includes a Vehicle Maintenance Facility and Mixed Martial Arts Pit.

该项目在设计时考虑到了未来的扩展.

The site was strategically developed to allow for an adjacent training center to be constructed without disrupting major systems, 例如地下公用设施或雨水系统. Native grasses were planted in the disturbed area outside of the building site to maintain the agrarian environment further.

提供与爱荷华州国民警卫队交叉训练的机会.

The new facility was constructed on a greenfield site adjacent to Camp Dodge. Regular meetings with key stakeholders ensured that the new site design had the capability of being integrated into Camp Dodge, 该地区最大的训练基地之一. This provides opportunities for cross-training with the Iowa National Guard.

  • 一层,46,199平方英尺预备役训练中心
  • 一层,3254平方英尺的汽车维修设施
  • 400 SF海军陆战队武术坑
  • 办公室/行政区域
  • 教室空间/培训
  • 钻大厅
  • 室内模拟射击教练(ISMT)
  • 外盖武器清洗区
  • 混凝土基础、混凝土楼板、砖石墙
  • 免下车维修舱
  • 战术车辆停放/存放区
  • 私家车停车场
  • 战术安全围栏
  • 体检室
  • 淋浴/更衣室
  • 反恐/武力保护
  • 实现了协作, 综合设计方法, including a 可持续性 设计 Charrette in conjunction with the Concept 设计 Workshop
  • 设计ed to take advantage of solar orientation and prevailing winds
  • 设计ed to achieve a 38% energy consumption from baseline based on ASHRAE 90.1-201
  • 调试 was performed on all of the major building systems, including the building envelope
  • Roof areas and at least 50% of the hardscape areas were provided with high solar reflectance index (SRI) materials
  • Plumbing fixtures are low-flow and USEPA 水sense-labeled products
  • 提供的所有景观都是本地或适应的物种, 耐旱, 而且不需要灌溉
  • Installed materials meet VOC and emission requirements defined in ASHRAE 189.1高性能绿色建筑设计标准
  • Installed materials include products with recycled content that exceeds 10% by cost and comply with recommendations of the EPA 采购 Guidelines
  • 待决的新建筑的指导原则遵守